  • Development of the ZAC (urban development zone) des Facultés in Saint-Maur-des-Fossés

    Location: Saint-Maur-des-Fossés (94)

    Contracting authority: Grand Paris Aménagement

    Firm’s appointment: Representative landscape architect

    Contract type: Project management for public space

    Timetable : 2020> 2026

    Budget : 8 M € HT

    Area : 6,6 ha

    Other main contractors : Ingetec (engineering consultancy for roads and networks) and Studio Vicarini (lighting designer)


  • Development of the village district in Villiers-le-Bel

    Location: Villiers-le-Bel (95)

    Contracting authority: Grand Paris Aménagement

    Firm’s appointment: Representative landscape architect and urban planner

    Contract type: Project management for public space

    Timetable: 2020> 2027

    Budget : 4 M € HT

    Area: 7 ha

    Other main contractors : Ingetec (engineering consultancy for roads and networks)


  • Urban and landscape recomposition of the Heinlex-Océanis sector in Saint-Nazaire

    Location : Saint-Nazaire (44)

    Contracting authority: ADDRN (urban planning agency of the Saint-Nazaire region)

    Firm’s appointment: Representative urban planner

    Contract type: Urban study to prepare an urbanism plan for programming and development

    Timetable: 2020 > 2022

    Fees : 79 000 € HT

    Area: 28,5 ha


  • Urban renewal of the Belleroche district in Villefranche-sur-Saône

    Location: Villefranche-sur-Saône (69)

    Contracting authority: OPAC du Rhône

    Firm’s appointment: Representative urban planner

    Contract type: Assignment as chief urbanist and landscape architect and project director to the Contracting Authority for sustainable development of the ZAC (Urban Development Zone)

    Timetable: 2020 > 2028

    Fees: 450 000 € HT

    Area: 17 ha

    Other main contractors : Florent Mazoyer (architects), Agi2D (Engineering consultancy firm in environmental quality standards), Lise Ducroux (attorney)


  • Development of the ” Island and Banks ” sector in Épinal

    Location: Épinal (88)

    Contracting authority: City of Épinal

    Firm’s appointment: Representative landscape and urban planner

    Contract type: Urban contractor for public space

    Timetable: 2020> 2025

    Budget: 2,9 M € HT

    Area: 16,5 ha

    Other main contractors : EGIS (engineering consultancy for roads and networks and sustainable development)


  • Development of the Bitola district (PRU) in Épinal

    Location: Épinal (88)

    Contracting authority: City of Épinal and OPH Épinal (municipal housing office)

    Firm’s appointment: Representative landscape and urban planner

    Contract type: Project management for urban and public space

    Timetable: 2020> 2025

    Budget: 6,6 M € HT (TF) and 5,1 M € HT (TC)

    Area: 5.5 ha

    Other main contractors : EGIS (engineering consultancy for roads and networks and sustainable development)


  • Requalification of the centrality of the Val Fourré district in Mantes-La-Jolie

    Location: Mantes-la-Jolie (78)

    Contracting authority: EPF Ile de France

    Firm’s appointment: Representative urban planner

    Contract type: Urban contractor for public space

    Timetable: 2019 > 2022

    Fees: 150 000 € HT

    Area: 100 ha

    Other main contractors : DESO (architects), Viviane Penet (programming for housing and operational planning and procedures), ZEFCO (environment), INGETEC (civil works, mobility, hydraulics)


  • Urban renewal of the plateau district in Viry-Chatillon

    Location: Viry-Chatillon (91)

    Contracting authority: EPT Grand-Orly Seine Bièvre

    Firm’s appointment: Representative urban planner

    Contract type: Master Plan elaboration, a feasibility study, and support for public consultation

    Timetable: 2019 > 2020

    Fees: 80 000 € HT

    Area: 85 ha

    Other main contractors : BERIM (General contractor) and Philippe Bassetti (Procedures in development and economic planning)


  • Development of the district of La Vigne aux Roses in La Roche sur Yon

    Location: La Roche sur Yon (85)

    Contracting authority: City and Agglomeration of La Roche sur Yon

    Firm’s appointment: Representative landscape designer

    Contract type: Project management of public space

    Timetable: Winning project in competition 2019 > 2025

    Budget: 4,2 M € HT including 1,6 M € for the park

    Area: 6,7 ha

    Other main contractors : BERIM (engineering consultancy for roads and networks) and IAO SENN (environment) and Geodice (mobility)


  • Development of the ZAC de la Rucherie in Bussy-Saint-Georges

    Location : Bussy-Saint-Georges (77)

    Contracting authority: EPAMARNE

    Firm’s appointment: Representative urban planner

    Contract type: Pre-operational urban study

    Timetable: 2019 > 2020

    Fees: 88 000 € HT

    Area: 40 ha

    Other main contractors : CREASPACE (economic programming), URBATEC (civil engineering, hydraulics), TRANS-FAIRE (environment)


  • Urban planning project of the Filmmakers/Plain at the Epinay-sous-Sénart District

    Location : Épinay-sous-Sénart (91)

    Contracting authority : CA Val d'Yerres Val de Seine

    Firm’s appointment : Representative urban planner

    Contract type : Urban planning project for the Les Cinéastes/La Plaine district project of national interest - NPNRU

    Timetable : 2019 > 2025

    Budget : Bidding part 240 000 € (Without value-added tax)

    Area : 16 ha

    Other Principal Contractors : BERIM (environmental engineering consultants), Respublica (dialogue and collaborative strategy consultants), REP (programming of public spaces), ZEFCO (environmental engineering consultants)


  • Urban development of the ‘8 may 1945’ boulevard in Torcy-le Creusot

    Location : Torcy and Le Creusot (71)

    Contracting authority : Urban Community of Le Creusot-Montceau-les-Mines

    Firm’s appointment : Representative landscape architect

    Contract type : Project management of public spaces, development work for the town’s entry boulevard

    Timetable : 2018 > 2023

    Budget : 6 M€ (Without value-added tax)

    Area: 4,8 ha

    Other Principal Contractors : OTCI (engineering consultancy for roads and networks, hydraulics), ETC (engineering consultancy for transport), Studio Vicarini (lighting designer)


  • Urban renewal of the upper part of the Creil District

    Location : City of Creil (60)

    Project owner : Groupement Ville de Creil et bailleurs (Oise Habitat, SA HLM de l'Oise, 1001 Vies Habitat)

    Firm’s appointment : Representative urban planner

    Contract type : Urban Project Management Framework Agreement - NPNRU

    Timetable : 2018 > 2028

    Budget : Based on subsequent contracts

    Area : 118 ha

    Other Principal Contractors : ESTRAN (architect), Filigrane (programming), ETC + SARECO (engineering consultancy for transport), Philippe Bassetti (operational planning and procedures), INGETEC (environmental engineering consultants)


  • Urban Renewal of the Val Fourré at Mantes-la-Jolie

    Location : Mantes-la-Jolie (78)

    Contracting authority : GPS&O Urban Community

    Firm’s appointment : Representative urban planner

    Contract type : Urban Project Management Framework Agreement - NPNRU

    Timetable : 2018 > 2028

    Budget : Bidding part 240 000 € (Without value-added tax)

    Area : 100 ha

    Other Principal Contractors : ESTRAN (architect), Filigrane (urban programming), REP (public space planning), ETC (engineering consultancy for transport), VPEAS (economist), ZEFCO (environmental engineering consultants)


  • Reclassification of the Jean-Jaurès avenue in Petit-Quevilly

    Location : Petit-Quevilly (76)

    Contracting authority : Rouen Normandie Métropole / Town of Petit-Quevilly

    Firm’s appointment : Landscape architect

    Contract type : Prime contractor for public space

    Timetable : Competition winner 2017 – Construction site in progress

    Budget :  6,3 M€ (Without value-added tax)

    Area : 3,4 ha

    Other Principal Contractors : Ingetec (engineering consultancy for roads and networks, hydraulics), StudioVicarini (lighting designer), Diluvial (fountain construction) et Geodice (mobility)

     


  • Urban Redevelopment of the Écrivains Area in Schiltigheim District (New Program For Urban Renewal)

    Location : Bischheim and Schiltigheim (67)

    Contracting authority : Eurométropole of Strasbourg

    Firm’s appointment : Representative urban planner and landscape architect

    Contract type :General urban plan (first phase) / Further development of urban plan (second phase)

    Timetable : 2017 > 2020 (first phase)/ 2020 > 2023 (second phase)

    Fees : 110 000 € (first phase) / 120 000 € (second phase) (Without value-added tax)

    Area : 15 hectares

    Other Principal Contractors : BERIM (engineering), Viviane PENET (urban programming consultant), Zefco (environment) and Citequanon (public space program)


  • Urban Redevelopment of the Hautepierre neighbourhood in Strasbourg (New Program for Urban Renewal)

    Location : Strasbourg (67)

    Contracting authority : Eurométropole of Strasbourg

    Firm’s appointment : Representative urban planner and landscape architect

    Contract type :General urban plan (first phase) / Further development of urban plan (second phase)

    Timetable : 2017 > 2020 (first phase)/ 2020 > 2023 (second phase)

    Fees : 130 000 € (first phase) / 120 000 € (second phase) (Without value-added tax)

    Area : 30 hectares

    Other Principal Contractors : BERIM (engineering), Viviane PENET (urban programming consultant), Zefco (environment) and Citequanon (public space program)


  • Public Space, Underground Parking lot and Market Hall planning at Courbevoie

    Location : Courbevoie (92)

    Contracting authority : City of Courbevoie

    Firm’s appointment : Co-contractor landscape architect

    Contract type : Contractor for public space

    Timetable : Competition winner 2016 – Construction site in progress

    Budget : 1,7 M€ (Without value-added tax)

    Area : 1 hectare

    Other Principal Contractors : CroixMarieBourdon (representative architect) et BEA (engineering consultants – general contracting)


  • Reclassification of the bank of the de Berre Pond at Saint-Chamas

    Location : Saint-Chamas (13)

    Contracting authority : Town of Saint-Chamas & Métropole Aix Marseille Provence

    Firm’s appointment : Representative urban planner and landscape architect

    Contract type : Urbanism plan, contractor for public space

    Timetable : Competition 2016 - Construction site in progress

    Budget :  2,1 M € (Town) / 3,6 M € (Metropole) (Without value-added tax)

    Area : 5,7 hectares

    Other Principal Contractors : PNG (architects), Studio Vicarini (lighting designer), Geodice (engineering consultancy for transport) et Oteis (engineering consultancy for infrastructure development, roads and networks)


  • Reclassification of the Mail des Cerclades and the des Galeries street at Cergy-Pontoise

    Location : Cergy-Pontoise (95)

    Contracting authority : Urban community of Cergy-Pontoise

    Firm’s appointment : Landscape architect

    Contract type : Urbanism plan, contractor for public space

    Timetable : Competition winner 2016 - Studies and design 2017> 2018 - Construction site in progress

    Budget : 4,5 M € (Without value-added tax)

    Area : 6700 m2

    Other Principal Contractors : Pannetier (architect), Studio Vicarini (lighting designer), REP (programming) et SETEC (engineering consultancy for infrastructure development, roads and networks)


  • Economic development southern Ile-de-France – Zac Val-Vert – Croix-Blanche

    Location : Plessis-Pâté, Sainte-Genevieve-des-Bois and Fleury-Mérogis (Urban community of Val d’Orge, 91)
    Contracting authority : SORGEM
    Firm’s appointment : Landscape architect
    Contract type : Framework agreement for contract urban and public space project management
    Timetable : Definition studies 2009, preliminary studies 2010 > 2011, framework agreement 2012 > 2024
    Budget : 28 M€ (Without value-added tax) for the public space of the Zone d’aménagement concertée (concerted land planning operations)
    Area : 67 hectares ZAC and 19,2 hectares public space
    Other Principal Contractors : DE-SO (architects), Techni’cité et Berim (technical engineering consultants), Alphaville (programming), Ch. Vicarini (lighting designer), Trans-Faire (environmental engineering consultants)

     